Location
Avda. de la Estación, 6
41530 Morón de la Frontera (Seville)
Exercise
Indicators
- Efficiency (PCI) 41%
- Average technical availability 87%
- REE 63%
- Self-consumption 3%
MORÓN
These facilities supply electrical energy to the network and exhaust gases for drying and reducing waste associated with the olive sector, the alperujo. This by product can be reused as fuel or as organic fertilizer.
The facilities consist of a cogeneration plant with 4 Innio Jenbacher engines of 2.7 MW each, which represents a total authorized supply power to the grid of 10.885 MW. The plant is managed by qualified mechanics and electronics operators who are part of the Neoelectra Morón staff in Andalusia.